Aerobic Fermenter BIOKON
Processing capacity 1000 t/year (functional internal volume 30 m³) for all biowaste including food waste. Easy transport and operational handling thanks to ABROLL solution.

Main Advantages
Processing capacity 1000 t/year (functional internal volume 30 m³) for all biowaste including food waste. Easy transport and operational handling thanks to ABROLL solution.
Possibility of off-grid operation without connection to the power grid
Possibility of off-grid operation without connection to the power grid
The simplest, most accessible and cheapest technology for municipal and other biowaste
The simplest, most accessible and cheapest technology for municipal and other biowaste
Simple plug and play installation
Simple plug and play installation
Fully automatic management of the aerobic fermentation process
Fully automatic management of the aerobic fermentation process
Optional Features
Processing capacity 1000 t/year (functional internal volume 30 m³) for all biowaste including food waste. Easy transport and operational handling thanks to ABROLL solution.
- Photovoltaic System
The fermenter can be equipped with a photovoltaic system for off-grid operation independent of connection to the electrical grid.
- Batch Preheating
The fermenter can be equipped with batch preheating for quick start of fermentation and certainty of sanitization.
- Integrated Biofilter
The fermenter can be equipped with an integrated Biofilter for enhanced environmental performance.
- Customizable Parameters
The parameters of the solution can be modified according to customer requirements for fermenter operation according to the installation location and seasons.
Technical Information
Processing capacity 1000 t/year (functional internal volume 30 m³) for all biowaste including food waste. Easy transport and operational handling thanks to ABROLL solution.
- Capacity30 m³
- Weight3.5 t
- Maximum batch weight17 t
- Length6500 mm
- Width2480 mm
- Height2650 mm
- Power supply230 / 400 V
- Power consumption - standby mode30 W
- Power consumption during aeration80 W
- Power consumption - with optional batch preheating2 to 6 kW
- Frame and hook liftAccording to DIN 30722
- Processing capacity1000 t/year
Ready to Transform Your Waste Management?
Contact us today to discuss how our solutions can address your specific waste management challenges.